- work with Michael Hamilton to revise proposal for facilities and infrastructure
- create a 3d site model
- inform the proposal by developing schematic design iterations of building systems and locations of buildings to run preliminary energy simulations
- create an online survey for UC faculty to better understand how a design/build might be implemented
- create an online survey for researchers to gather their ideas and discover how they might inform and collaborate on the facilities and infrastructure
- set dates for fall conference and make a list of people to invite
Showing posts with label Michael Hamilton. Show all posts
Showing posts with label Michael Hamilton. Show all posts
Tuesday, June 8, 2010
Monday, June 7, 2010
Day 1 - BORR site tour with Michael Hamilton, Reserve Director
After lunch we got a tour of the 3,270 acres from Reserve Director Mike Hamilton. The tour included a general orientation of the site, including:
Archealogical sites
Big Lake
Poverty Ridge
Arroyo Hondo
Steep Road
Ropeswing Pond
Amos White cabin
Subscribe to:
Posts (Atom)
